DL/T 2537-2022 Active

DL/T 2537-2022 The fiber rope used for overhead transmission line construction

Publish Date: 2022-11-04

DL/T 2536-2022 Active

DL/T 2536-2022 Suspended transmission line temporary anchor body

Publish Date: 2022-11-04

DL/T 2535-2022 Active

DL/T 2535-2022

Publish Date: 2022-11-04

DL/T 2534-2022 Active

DL/T 2534-2022 Power system security and stability control system testing technology specification

Publish Date: 2022-11-04

DL/T 2533-2022 Active

DL/T 2533-2022 The safety measures specifications for on-site work of protective and security automatic devices in power plants

Publish Date: 2022-11-04

DL/T 2568-2022 Active

DL/T 2568-2022 Digital Audit Platform Function Components and Technical Requirements for the Electric Power Industry

This document specifies the audit management, audit operations, data management, and other functional components of the digital audit platform in the power industry, as well as the technical requirements. This document is applicable to the planning, design, development, implementation, and application of digital audit platforms in the power industry.

Publish Date: 2022-11-04

DL/T 2532-2022 Active

DL/T 2532-2022 High-voltage direct current protection device field test guidelines

Publish Date: 2022-11-04

DL/T 2567-2022 Active

DL/T 2567-2022 Guidance for optimizing dust removal system operation of power generating units

This document specifies the basic principles, technical requirements, and implementation methods for the operation optimization of the dust removal system of thermal power units. This document is applicable to the operation optimization of the dust removal system of thermal power units.

Publish Date: 2022-11-04

DL/T 2531-2022 Active

DL/T 2531-2022 Remote intelligent operation and management guidelines for relay protection technology

Publish Date: 2022-11-04

DL/T 2557-2022 Active

DL/T 2557-2022 Guidelines for Voltage Applied on AC Side and Partial Discharge Field Test of Converter Transformer Valve Side Electrical Endurance Test Result and Practical Procedures for Substitution

This document specifies the test methods and wiring, test conditions, test equipment, test procedures, test pass criteria, interference source identification and suppression requirements for the on-site tests of AC external insulation and partial discharge of converter transformers on the valve side. This document is applicable to the on-site tests of AC external insulation and partial discharge of converter transformers on the valve side conducted by using the series resonance test method.

Publish Date: 2022-11-04

DL/T 2530.1-2022 Active

DL/T 2530.1-2022 Electric power cable testing equipment general technical specification Part 1: General requirements for locating faults in cables using electrical bridges

Publish Date: 2022-11-04

DL/T 2556.2-2022 Active

DL/T 2556.2-2022 Electricity Industry Electromagnetic Compatibility Testing Assist Equipment - Part 2: Energy Meter Test Set for Electromagnetic Compatibility Testing

This document specifies the typical structure, product performance, and standardized use requirements of power meters testing devices used in electromagnetic compatibility testing in laboratories. This document is applicable to power meters testing devices used in electromagnetic compatibility testing of power meters.

Publish Date: 2022-11-04