GB/T 40788-2021 Active National standards

GB/T 40788-2021 Ships and marine technology—Offshore wind energy—Port and marine operations

GB/T 40788-2021 Ships and marine technology—Offshore wind energy—Port and marine operations

Publish Date: 2021-10-11 Implement Date: 2022-05-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: GB/T 40788-2021
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: Basic standards and general methods
ICS Name: Maritime engines and propulsion systems
Publish Date: 2021-10-11
Implement Date: 2022-05-01
Pages: 177 pages

Scope

This document provides comprehensive requirements and guidance for the planning and engineering implementation of offshore wind farm port and offshore operations, including all documents and work related to such operations, such as the analysis and design of components, systems, equipment, and procedures for carrying out port and offshore operations, as well as the methods or procedures established for safely executing these operations.
This document aims to provide comprehensive information on all relevant port and offshore operations for offshore wind farms, including loading, offshore transportation, installation, offshore commissioning, operation and maintenance, component replacement, repair operations, and the decommissioning or redeployment of offshore wind farms.
This document applies to the following offshore structures and operations, including:
——Steel foundation structures;
——Concrete gravity foundation structures;
——High-pile steel foundations or steel-concrete hybrid foundation structures;
——Seabed templates or similar temporary structures, temporary auxiliary installation equipment;
——Steel or hybrid material tower cylinders, wind turbine generator nacelles, and blades;
——Turbines moored to the seabed;
——Self-elevating offshore structures used for offshore substations or offshore living platforms;
——Launching systems for ships from docks or coasts;
——Array cables within wind farms and output cables connecting wind farms to the power grid.
This document also applies to the modification of existing structures, such as installing additional components, replacing components, or decommissioning and dismantling, as well as offshore operations related to technical maintenance during the lifespan of wind farms.
This document does not apply to the following operations:
——Construction activities, such as pre-assembly sites on land that are not exposed to marine environments;

Development Information

Word Count: 340 Thousand words Pages: 177 pages

Referenced Standards

ISO 19901-1 ISO 19901-7 ISO 19905-1 IMCA LR 008 M 179