DB61/T 1694-2023 Active Shaanxi ProvinceLocal standards

DB61/T 1694-2023 Inspecting rules for welding equipment for polyethylene piping

DB61/T 1694-2023 Inspecting rules for welding equipment for polyethylene piping

Publish Date: 2023-05-25 Implement Date: 2023-06-25 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: DB61/T 1694-2023
Standard Type: Local standards
Standard Status: Active
is_force_gb: no
CCS Name: Plastic profiles
ICS Name: Plastic pipes, fittings, and valves
Publish Date: 2023-05-25
Implement Date: 2023-06-25
Pages: 18 pages

Scope

This document specifies the scope of inspection for in-service polyethylene pipe welding equipment, normative referenced documents, terms and definitions, general principles, inspection of electric fusion welding machines, fully automatic thermal fusion welding machines, semi-automatic thermal fusion welding machines, inspection conclusions and determination rules, inspection reports, and other requirements. This document applies to the inspection of in-service polyethylene pipe welding equipment (including electric fusion welding machines, fully automatic thermal fusion welding machines, and semi-automatic thermal fusion welding machines). The inspection of thermal fusion and electric fusion welding equipment used for connecting other plastic pipes (such as PE-X, PP, PVDF, PVC-C, PVC-U, etc.) can be carried out in accordance with this document. This document does not apply to manually driven thermal fusion welding machines, special-purpose welding equipment with specific requirements, PE socket welding machines, high-frequency welding equipment, vibration welding equipment, and friction welding equipment, etc.

Development Information

Pages: 18 pages

Related Standards

Contact Us