DB34/T 1787-2012 Active Anhui ProvinceLocal standards

DB34/T 1787-2012 Technical specification for Long Spiral Drilling and Pressure-filling Pile Technology

DB34/T 1787-2012 Technical specification for Long Spiral Drilling and Pressure-filling Pile Technology

Publish Date: 2012-12-24 Implement Date: 2013-01-24 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 30
Out of stock

Basic Information

Standard Code: DB34/T 1787-2012
Standard Type: Local standards
Standard Status: Active
is_force_gb: no
CCS Name: Construction engineering construction machinery
ICS Name: Construction equipment
Publish Date: 2012-12-24
Implement Date: 2013-01-24

Scope

This regulation applies to the investigation, design, construction, quality inspection, and acceptance of long-spiral drilling and grouting pile foundations for industrial and civil buildings and municipal engineering projects in our province. This type of pile foundation is suitable for foundations composed of uncompacted soil, clay, silt, sand, loose sand and gravel, fully weathered rock layers, or strongly weathered rock layers. Long-spiral drilling and grouting piles are divided into piles with reinforcing cages grouted after grouting concrete and piles grouted with pure concrete. The former are designed, constructed, inspected, and accepted according to pile foundation theory, while the latter are designed, constructed, inspected, and accepted according to composite foundation theory.

Development Information

Related Standards

Contact Us