DL/T 2525-2022 Active Industry standards-Electricity

DL/T 2525-2022 The technical guidelines for the renovation of the circulating water supply system of a double-pressure and double-rotor steam turbine unit for heat supply using a dual-bed cycle

DL/T 2525-2022 The technical guidelines for the renovation of the circulating water supply system of a double-pressure and double-rotor steam turbine unit for heat supply using a dual-bed cycle

Publish Date: 2022-05-13 Implement Date: 2022-11-13 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 30
Out of stock

Basic Information

Standard Code: DL/T 2525-2022
Standard Type: Industry standards
Standard Status: Active
is_force_gb: no
CCS Name: Power stations and the operation and maintenance of power systems
ICS Name: Integrated power station
Publish Date: 2022-05-13
Implement Date: 2022-11-13

Scope

This document specifies the technical requirements for the retrofit project of dual-backpressure dual-rotor interchangeable circulating water heating of steam turbine units in the aspects of feasibility study, design, modification of the steam turbine body, auxiliary equipment and systems, as well as installation and maintenance, commissioning and testing. This document is applicable to dual-backpressure dual-rotor interchangeable circulating water heating retrofit of pure condensing and extraction condensing steam turbine units. For low-pressure light-axis rotor exhaust heat recovery retrofit, low-pressure rotor disassembly and assembly of the last two blades circulating water heating retrofit, and air-cooled units with a common low-pressure rotor high-backpressure heat recovery retrofit, the steam turbine units can be used as a reference for implementation.

Development Information

Related Standards

Contact Us