DL/T 5556-2019
Active
Industry standards-Electricity
DL/T 5556-2019 Code for design of circulating f1uidized bed boiler system of fossil-fired power plant
DL/T 5556-2019 Code for design of circulating f1uidized bed boiler system of fossil-fired power plant
Price:
$ 30
Basic Information
Standard Code:
DL/T 5556-2019
Standard Type:
Industry standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Electricity and nuclear industry engineering
ICS Name:
Integrated power station
Publish Date:
2019-06-04
Implement Date:
2019-10-01
Pages:
87 pages
Scope
1.0.1 In order to standardize the design of circulating fluidized bed boiler systems in thermal power plants and meet the requirements of safety, reliability, advanced technology, and economic rationality, this standard is formulated. 1.0.2 This standard applies to the design of circulating fluidized bed boiler systems in thermal power plants with a single-unit capacity of 125MW or more that use fossil fuels, including flue gas and air systems, fuel preparation systems, boiler fuel supply systems, limestone powder preparation and transportation systems, bed material systems, bottom ash systems, start-up combustion oil systems, and emergency water supply systems, etc.
Development Information
Related Standards
GB/T 14541-1993
Replaced
GB/T 14542-1993
Replaced
GB/T 14542-1993 Guide for maintenance and supervision of transformer oil in service
GB/T 2819-1995
Active
GB/T 2819-1995 Mobile electric power plant, general specification for
GB/T 15149.2-1998
Abolished
GB/T 15149.2-1998 Performance and testing of teleprotection eguipment of power systems Part 2:Analogue comparison systems
GB/T 15153.1-1998
Replaced
GB/T 15153.1-1998 Telecontrol equipment and systems Part 2:Operating conditions Section 1:Power supply and electromagnetic compatibility
GB/T 17463-1998
Active