GB/T 41164-2021 Active National standards

GB/T 41164-2021 Specifications technology for multistage fracturing in horizontal well within roof of broken-soft and low permeability coal seam

GB/T 41164-2021 Specifications technology for multistage fracturing in horizontal well within roof of broken-soft and low permeability coal seam

Publish Date: 2021-12-31 Implement Date: 2022-07-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: GB/T 41164-2021
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: Mining
ICS Name: Mining and excavation
Publish Date: 2021-12-31
Implement Date: 2022-07-01
Pages: 15 pages

Scope

This document specifies the requirements for the design, construction, and evaluation of the segmented hydraulic fracturing scheme for horizontal wells in the roof of coal seams used for coal seam gas extraction. This document is applicable to the segmented hydraulic fracturing of horizontal wells in the roof of brittle, soft, and low-permeability coal seams. The segmented hydraulic fracturing of horizontal wells in other coal body structures or the bottom of coal seams can be used as a reference.

Development Information

Word Count: 32 Thousand words Pages: 15 pages

Referenced Standards

NB/T 14002.2-2023 Shale gas reservoir enhancement - Part 2: Standardization of industrial fracturing operations NB/T 14002.2-2017 Shale gas reservoir enhancement - Part 2: Technical specifications for factory-based fracturing operations NB/T 14002.4-2022 Shale gas reservoir modification - Part 4: Horizontal well pumping bridge plug-perforation joint operation technology recommended practices NB/T 14002.4-2015 Shale gas reservoir enhancement - Part 4: Horizontal well pump-in bridge-to-well perforation joint technology recommended practices NB/T 14002.5-2023 Shale gas reservoir modification - Part 5: Specification for horizontal well drilling and grinding bridge plug operations NB/T 14002.5-2016 Shale gas reservoir enhancement Part 5: Horizontal well drilling and grinding bridge plug operations requirements SY/T 5107-2016 Evaluation methods for the performance of water-based fracturing fluids SY/T 5108-2014 Testing methods for proppant performance in hydraulic fracturing and gravel packing operations SY/T 5289-2016 The design, construction, and evaluation methods for fracturing of oil, gas, and water wells SY 5289-1991 Evaluation method for the effect of oil well fracturing SY/T 5587.5-2018 Regular well completion operation regulations Part 5: Well preparation for downhole operations SY/T 5587.5-1993 Oil and water well conventional workover operations, oil and water well sand exploration and sand washing operation procedures SY/T 5727-2020 Underground Work Safety Regulations SY 5727-2014 Underground operation safety regulations SY/T 6253-2016 Horizontal well perforation operation technical specification SY/T 6302-2019 Fracturing support fluid permeability testing method SY/T 6302-2009 The recommended method for evaluating the short-term permeability of fracturing support material filled layers SY/T 6610-2017 The safety specifications for underground operations in hydrogen sulfide environments SY/T 6690-2016 Well Control Technology Regulations for Underground Operations SY/T 6690-2008 Well Control Technology Regulations for Underground Operations SY/T 7014-2014 SY/T 7014-2014 Fracturing Tool for Segmentation。 SY/T 7372-2017 Microseismic ground monitoring technical specification SY/T 5107-2005 Water-based fracturing fluid performance evaluation method SY/T 5108-1997 The recommended methods for testing the performance of fracturing support materials SY/T 5108-2006 Fracturing support media performance indicators and recommended testing methods SY/T 5289-2000 Evaluation method for the effect of oil well fracturing SY/T 5289-2008 The design, construction, and evaluation methods for fracturing of oil, gas, and water wells SY 5727-2007 Underground Work Safety Regulations SY/T 6253-1996 Horizontal well perforation technical specification SY/T 6253-2007 Horizontal well perforation construction specifications SY/T 6302-1997 The recommended method for evaluating the short-term permeability of fracturing support material filled layers SY/T 6610-2005 Recommended methods for downhole operations in gas and oil wells containing hydrogen sulfide SY/T 6610-2014 Recommended Practices for Underground Operations in Hydrogen Sulfide-Containing Oil and Gas Wells SY/T 7372-2024 SY/T 7372-2024 Microseismic ground monitoring technical regulations SY/T 6690-2024 Well Control Technology Regulations for Underground Operations

Related Standards

Contact Us