GB 17646-1998
Replaced
NB/T 31104-2016
Active
Industry standards-Energy
NB/T 31104-2016 Report Preparation Procedures for the Pre-feasibility Study of Offshore Wind Farm Engineering
NB/T 31104-2016 Report Preparation Procedures for the Pre-feasibility Study of Offshore Wind Farm Engineering
Price:
$ 30
Basic Information
Standard Code:
NB/T 31104-2016
Standard Type:
Industry standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Power station project
ICS Name:
Wind power generation systems and other energy sources
Publish Date:
2016-12-05
Implement Date:
2017-05-01
Pages:
44 pages
Scope
This guideline is formulated to standardize the principles, work content, work depth, and technical requirements for the preparation of pre-feasibility study reports for onshore wind power projects.
Development Information
Related Standards
GB 18451.1-2001
Replaced
GB 18451.1-2001 Wind turbine generator systems—Safety requirements
GB/T 2900.53-2001
Active
GB/T 2900.53-2001 Electrotechnical terminology—Wind turbine generator systems
GB/T 18709-2002
Active
GB/T 18709-2002 Methodology of wind energy resource measurement for wind farm
GB/T 18710-2002
Active
GB/T 18710-2002 Methodology of wind energy resource assessment for wind farm
GB/T 4750-2002
Replaced