GB 16727-1997
Replaced
DB11/T 1832.9-2022
Active
Beijing CityLocal standards
DB11/T 1832.9-2022 Construction Work Procedure Regulations Part 9: Roofing Engineering
DB11/T 1832.9-2022 Construction Work Procedure Regulations Part 9: Roofing Engineering
Basic Information
Standard Code:
DB11/T 1832.9-2022
Standard Type:
Local standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Architectural construction and decoration projects
ICS Name:
\nThe roof
Publish Date:
2022-03-28
Implement Date:
2022-07-01
Pages:
114 pages
Development Information
Same series standard
DB11/T 1832.7-2022 Construction Techniques and Procedures for Building Construction - Part 7: Building Flooring Engineering
DB11/T 1832.8-2022 Code for Construction Technology of Architectural Engineering Part 8: Window and Door Engineering
DB11/T 1832.10-2022 Construction Work Procedure Regulations Part 10: Decoration and Refurbishment Engineering
DB11/T 1832.11-2022 Code for Construction Technology of Architectural Engineering Part 11: Curtain Wall Engineering
DB11/T 1832.12-2022 Construction Work Procedure Regulations Part 12: Thermal Insulation Engineering
DB11/T 1832.13-2022 Code for Construction Workmanship Part 13: Water Supply and Drainage Engineering
DB11/T 1832.14-2022 Code for Construction Workmanship Part 14: Heating Engineering
DB11/T 1832.15-2022 Part 15 of the Construction Engineering Construction Technology Regulations: Ventilation and Air Conditioning Installation Engineering
DB11/T 1832.20-2022 Code for Construction Technology of Building Engineering Part 20: Elevator System Engineering
Related Standards
GB 16728-1997
Replaced
GB 16728-1997 Prestressed concrete ribbed roof slabs
GB/T 14040-2007
Active
GB/T 14040-2007 Prestressed concrete hollow-core slabs
GB/T 16727-2007
Replaced
GB/T 16727-2007 Precast prestressed concrete panel for composite slab
GB/T 16728-2007
Active
GB/T 16728-2007 Prestressed concrete ribbed roof slabs
JG/T 346-2011
Active