GB/T 14627-1993
Replaced
DL/T 2578-2022
Active
Industry standards-Electricity
DL/T 2578-2022 "DL/T 2578-2022 Start-up Test Regulations for Impulse Turbine Generator Sets"
DL/T 2578-2022 "DL/T 2578-2022 Start-up Test Regulations for Impulse Turbine Generator Sets"
Price:
$ 30
Basic Information
Standard Code:
DL/T 2578-2022
Standard Type:
Industry standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
\nHydraulic turbines and their auxiliary equipment
ICS Name:
Hydraulic engineering
Publish Date:
2022-11-04
Implement Date:
2023-05-04
Scope
This document specifies the start-up and trial run test procedures and requirements for impact turbine generator sets with a single-machine capacity of 5 MW or more, and a rotor diameter of 1.0 m or more. This document is applicable to the start-up and trial run tests and acceptance inspections of impact turbine generator sets and related equipment in hydropower stations.
Development Information
Related Standards
GB/T 15468-1995
Replaced
GB/T 15468-1995 Fundamental technical requirements for hydraulic turbines
GB/T 15469-1995
Replaced
GB/T 15469-1995 Cavitation pitting evaluation in reaction hydraulic turbines
GB/T 15613-1995
Replaced
GB/T 15613-1995 Code for model acceptance tests of hydraulic turbines
GB/T 16166-1996
Replaced
GB/T 16166-1996 Sacrificial anode cathodic protection for seawater cooling system in coastal power station
GB/T 10969-1996
Replaced