GB/T 15543-1995
Replaced
DB11/T 2077-2023
Active
Beijing CityLocal standards
DB11/T 2077-2023 City Sub-Center Technical Specification for the Configuration of New Power System Facilities with 10kV and Below Distribution Network (10kV and Below)
DB11/T 2077-2023 City Sub-Center Technical Specification for the Configuration of New Power System Facilities with 10kV and Below Distribution Network (10kV and Below)
Basic Information
Standard Code:
DB11/T 2077-2023
Standard Type:
Local standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Technical management
ICS Name:
The integrated transmission and distribution network
Publish Date:
2023-03-30
Implement Date:
2023-07-01
Pages:
44 pages
Development Information
Related Standards
GB/T 15544-1995
Replaced
GB/T 15544-1995 Short-circuit current calculation in three-phase a.c. systems
GB/T 18857-2002
Replaced
GB/T 18857-2002 Technical guide for live working in distribution line
GB/T 13730-2002
Active
GB/T 13730-2002 Dispatching automation systems for distric power networks
GB/T 2694-2003
Replaced
GB/T 2694-2003 Transmission line tower—Technical requirements for manufacturing
GB/T 11920-2008
Active