GB/T 43595-2023 Active National standards

GB/T 43595-2023 Directives for commissioning and operation of hydraulic turbines,pump-turbines and storage pumps

GB/T 43595-2023 Directives for commissioning and operation of hydraulic turbines,pump-turbines and storage pumps

Publish Date: 2023-12-28 Implement Date: 2025-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: GB/T 43595-2023
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: \nHydraulic turbines and their auxiliary equipment
ICS Name: Hydraulic engineering
Publish Date: 2023-12-28
Implement Date: 2025-01-01
Publisher: 国家市场监督管理总局、国家标准化管理委员会
Technical Committee: 全国水轮机标准化技术委员会(SAC/TC 175)
Pages: 44 pages

Scope

本文件给出了一般情况下水轮机、水泵水轮机、蓄能泵启动试验及试运行的程序,并为上述设备启动试验与试运行提供指导。
本文件未对水轮机、水泵水轮机和蓄能泵所属辅助设备的启动试验与试运行进行详细描述,认为辅助设备的启动试验与试运行是单独完成的。
本文件适用于容量15 MW及以上或公称直径3 m及以上的机组设备,容量15 MW以下或公称直径3 m以下的机组设备参考IEC 62006执行。
本文件仅在各缔约方同意的情况下才具有约束力。
本文件不包括纯商业利益的事项,除非该事项与调试和试运行工作密切相关。
本文件不涉及流道、闸门、排水泵、冷却水设备、发电机、发电电动机、电气装置(如断路器、变压器)等单项调试,除非其调试与水轮机、水泵水轮机和蓄能泵的启动试验不可分离。
本文件规定的相关文件、图纸或信息由一个(或多个)供应商提供时,每个供应商提供与自己业务相关的资料。

Development Information

Drafting Units:

中国长江三峡集团有限公司、湖北能源集团股份有限公司、中国长江电力股份有限公司、雅砻江流域水电开发有限公司、中国水利水电科学研究院、水利部农村电气化研究所、东方电气集团东方电机有限公司、中国葛洲坝集团机电建设有限公司、重庆水轮机厂有限责任公司、中国电建集团华东勘测设计研究院有限公司、长江勘测规划设计研究有限责任公司、哈尔滨电机厂有限责任公司、安德里茨(中国)有限公司、国网甘肃省电力公司电力科学研究院、东芝水电设备(杭州)有限公司、浙江富春江水电设备有限公司、广东蓄能发电有限公司

Drafting Persons:

姜德政、宋晶辉、周杰、赵本成、宫让勤、徐伟、曾明富、潘罗平、郑涛平、陈强、徐文杰、莫文华、武振波、董开松、王建明、王伦其、刘秀良、王献奇、陈维勤、张梁、熊建平、胡广恒

Word Count: 76 Thousand words Pages: 44 pages

Adopt standards

IEC 60545:2021

Related Standards

Contact Us