GB/Z 28805-2012 Active National standards

GB/Z 28805-2012 Intelligrid methodology for developing requirements for energy systems

GB/Z 28805-2012 Intelligrid methodology for developing requirements for energy systems

Publish Date: 2012-11-05 Implement Date: 2013-05-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: GB/Z 28805-2012
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: Basic standards and general methods
ICS Name: Comprehensive Electrical Engineering
Publish Date: 2012-11-05
Implement Date: 2013-05-01
Pages: 81 pages

Scope

This guidance technical document specifies a set of engineering methods for describing and determining user requirements for smart grid systems.
This guidance technical document is applicable to the process of determining user functional and performance requirements in project or system development.
This guidance technical document (PAS) is based on the business needs of utility companies and provides a set of methods for experts in the power system field to identify and describe user requirements in automation systems. This method was initially researched and developed by the Electric Power Research Institute (EPRI) as part of the smart grid architecture, and it is a pathway to achieving future automated, self-healing, and efficient power systems.
This chapter describes the scope, purpose, and objectives of this guidance technical document, as well as the underlying systems on which it relies.

Development Information

Word Count: 153 Thousand words Pages: 81 pages

Adopt standards

IEC/PAS 62559:2008

Related Standards

Contact Us