NB/T 20037.9-2018 Active Industry standards-Energy

NB/T 20037.9-2018 Nuclear Power Plant First-Level Probabilistic Safety Assessment Part 9: Other External Disasters during Power Operation

NB/T 20037.9-2018 Nuclear Power Plant First-Level Probabilistic Safety Assessment Part 9: Other External Disasters during Power Operation

Publish Date: 2018-03-22 Implement Date: 2018-09-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 30
Out of stock

Basic Information

Standard Code: NB/T 20037.9-2018
Standard Type: Industry standards
Standard Status: Active
is_force_gb: no
CCS Name: \nNuclear island of a nuclear power plant
ICS Name: Nuclear power stations, safety
Publish Date: 2018-03-22
Implement Date: 2018-09-01

Scope

This section specifies the requirements for the Level 1 Probabilistic Safety Assessment (PSA) of power operation against other external disasters. This section applies to the Level 1 PSA of power operation against other external disasters (excluding earthquakes, strong winds, and external flooding) in pressurized water reactor nuclear power plants. The Level 1 PSA of other internal disasters (excluding internal events, internal flooding, and internal fires) can also be referenced. Nuclear power plants of other reactor types can implement this section as a reference.

Development Information

Same series standard

Related Standards

Contact Us