NB/T 10140-2019 Active Industry standards-Energy

NB/T 10140-2019 Technical Code for Post - assessment of Environmental Impacts of Hydropower Projects

NB/T 10140-2019 Technical Code for Post - assessment of Environmental Impacts of Hydropower Projects

Publish Date: 2019-06-04 Implement Date: 2019-10-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 30

Basic Information

Standard Code: NB/T 10140-2019
Standard Type: Industry standards
Standard Status: Active
is_force_gb: no
CCS Name: Hydropower projects
ICS Name: Hydraulic engineering
Publish Date: 2019-06-04
Implement Date: 2019-10-01
Pages: 58 pages

Scope

1.0.1 In order to standardize the principles, content, and methods of post-evaluation of the environmental impact of hydropower projects, and to unify technical requirements, these regulations are formulated. 1.O.2 These regulations apply to the investigation, analysis, and evaluation of the actual environmental impact of hydropower projects after they have been in stable operation for a certain period of time. 1.0.3 The post-evaluation of the environmental impact of hydropower projects shall be based on the overall requirements of river basin environmental protection, and follow the principles of objectivity, fairness, scientific system, and focusing on key issues. It shall conduct an in-depth analysis of the long-term, cumulative, and regional environmental impacts of hydropower projects and the trends of environmental changes, and objectively evaluate the environmental quality status and the implementation effect of environmental protection measures. 1.0.4 In addition to complying with these regulations, the post-evaluation of the environmental impact of hydropower projects shall also comply with the provisions of relevant national standards currently in force.

Development Information

Pages: 58 pages

Related Standards

Contact Us