GB/T 25382-2010 Active National standards

GB/T 25382-2010 Regulations for operational acceptance test of off-grid wind/solar hybrid generator system

GB/T 25382-2010 Regulations for operational acceptance test of off-grid wind/solar hybrid generator system

Publish Date: 2010-11-10 Implement Date: 2011-03-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: GB/T 25382-2010
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: Wind energy
ICS Name: Wind power generation systems and other energy sources
Publish Date: 2010-11-10
Implement Date: 2011-03-01
Pages: 7 pages

Scope

This standard specifies the acceptance procedures, acceptance methods, and documentation for off-grid wind-solar hybrid power generation systems with an energy storage-based DC bus and a total (mixed) power of 100 kW or less.
This standard applies to the acceptance of off-grid wind power generators and solar photovoltaic modules (arrays) that make up an energy storage-based DC bus system with a total (mixed) power of 100 kW or less before they are put into operation.

Development Information

Word Count: 10 Thousand words Pages: 7 pages

Referenced Standards

Related Standards

Contact Us