GB/T 41576-2022 Active National standards

GB/T 41576-2022 Requirements for unit performance test after initial fuel loading of pressurized water reactor nuclear power plants

GB/T 41576-2022 Requirements for unit performance test after initial fuel loading of pressurized water reactor nuclear power plants

Publish Date: 2022-11-01 Implement Date: 2023-02-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: GB/T 41576-2022
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: Nuclear power plant
ICS Name: Nuclear power stations, safety
Publish Date: 2022-11-01
Implement Date: 2023-02-01
Pages: 9 pages

Scope

This document specifies the test objectives, test conditions, test content, acceptance criteria, and test records and reports for the unit performance test of a pressurized water reactor nuclear power plant after initial loading.
This document is applicable to the unit performance test of a pressurized water reactor nuclear power plant after initial loading.

Development Information

Word Count: 20 Thousand words Pages: 9 pages

Referenced Standards

Related Standards

Contact Us