GB/T 25921-2010 Active National standards

GB/T 25921-2010 Electrical and instrumentation loop check

GB/T 25921-2010 Electrical and instrumentation loop check

Publish Date: 2011-01-14 Implement Date: 2011-05-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: GB/T 25921-2010
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: Industrial automation instrumentation and control devices
ICS Name: The measurement and control of industrial processes
Publish Date: 2011-01-14
Implement Date: 2011-05-01
Pages: 15 pages

Scope

This standard defines the steps required to complete the loop test, which includes the work from the completion of the loop construction (including installation and point-to-point line checking) to the pre-commissioning in a cold state.
This standard applies to the instrumentation and electrical parts (including PLCs, BASs, DCSs, panel-mounted and field instruments) of new factories and existing factories that need to be expanded/modified.
Except for the parts related to the tested loop (such as the power supply for motor starters or four-wire transmitters), this standard does not include the detailed inspection of other power distribution systems.

Development Information

Word Count: 26 Thousand words Pages: 15 pages

Adopt standards

IEC 62382:2006

Related Standards

Contact Us