T/HNSGJXH 0034-2024 Active Group standards

T/HNSGJXH 0034-2024 Lianyuan Lianhong Wenzhou sweet orange cultivation technical specification

T/HNSGJXH 0034-2024 Lianyuan Lianhong Wenzhou sweet orange cultivation technical specification

Publish Date: 2024-06-15 Implement Date: 2024-07-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 30
Out of stock

Basic Information

Standard Code: T/HNSGJXH 0034-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Plant cultivation
Publish Date: 2024-06-15
Implement Date: 2024-07-01

Scope

Main Technical Content: 3.1 Terms and Definitions The following terms and definitions apply to this document. 3.1 "Lianyuan Lianhong" Citrus "Lianyuan Lianhong" citrus refers to early- and mid-ripening fresh fruit varieties such as Golden Autumn Sugar Orange, Wenzhou Mandarin, and Navel Orange, as well as processing varieties like Daidai Sour Orange, Ou Orange, and Golden Orange, produced within the specific ecological environment of Lianyuan City between 111°-111°E and 27°-28°N. 3.2 "Lianyuan Lianhong" Wenzhou Mandarin "Lianyuan Lianhong" citrus refers to early- and mid-ripening Wenzhou Mandarin produced within the specific ecological environment of Lianyuan City between 111°-111°E and 27°-28°N. The main varieties include Dafen No. 4, Miyamoto, Miyakawa, and Xingjin. 4 Orchard Construction 4.1 Site Selection and Planning Should comply with the provisions of T/HNSGJXH 0031. 4.2 Water, Fertilizer, and Irrigation Facilities The irrigation water quality should meet the GB/T 5084 standard for farmland irrigation water quality. - Build a 100-m3 water tank and a 30-50-m2 fertilizer and watering facility room at the highest point of the nearest water source in a 100-acre orchard. Equip with watering tanks, fertilizer tanks, and filtration systems, as well as booster pumps and water/fertilizer pipelines. - Install branch pipes along the roadside to connect to each row of trees. - Bury the main drug-spraying pipeline along the edge of the main road, with valve interfaces every 50-100 m. 4.3 Drainage System Should comply with the provisions of T/HNSGJXH 0031. 4.4 Shelterbelt Construction Should comply with the provisions of T/HNSGJXH 0031. 4.5 Planting 4.5.1 Seedling Quality Requirements Should comply with the provisions of T/HNSGJXH 0030. 4.5.2 Timing Should comply with the provisions of T/HNSGJXH 0031. 4.5.3 Density Adopt a wide-row narrow-spacing planting pattern. For slopes with a gradient of less than 15° and flat land,

Development Information

Related Standards

Contact Us