PDF

GB/T 45905.5-2025 Active

GB/T 45905.5-2025 Electricity spot market operation—Part 5:Calculation method of incorporating intermittent new energy into power system balance

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2025-08-01

Abstract

This document specifies the requirements for the basic data sources, data processing methods, and calculation methods for wind power, photovoltaics, and other new energy sources to participate in power balancing at different time scales under the environment of the electricity spot market.
This document is applicable to provincial and higher-level power grids for calculating the reliable generating capacity of wind power, photovoltaics, and other new energy sources to be included in power balancing, analyzing and estimating the adequacy of power supply, determining unit combinations, and verifying the balance of transactions, etc.

General Product Information

Document Type National standards
Standard Status Active
Standard Code GB/T 45905.5-2025
CCS Electricity
ICS The transmission grid and the distribution grid
Implement Date 2026-02-01
Price $ 33.00
Subtotal $ 33.00
Tax $ 0.00
Order Total (incl. tax) $ 33.00

Log In

Contact Us