PDF
DB32/T 3722-2020 Active
DB32/T 3722-2020 Code for compiling feasibility study report of well-facilitated farmland construction project
Abstract
This standard specifies the principles and working procedures, content, depth, and preparation requirements for the preparation of feasibility study reports for high-standard farmland construction projects.
This standard applies to the preparation of feasibility study reports for high-standard farmland construction projects (excluding water-saving supporting renovation projects for large and medium-sized irrigation districts).
General Product Information
| Document Type | Jiangsu ProvinceLocal standards |
|---|---|
| Standard Status | Active |
| Standard Code | DB32/T 3722-2020 |
| CCS | \nSoil and water and soil conservation |
| ICS | Integrated agriculture and forestry |
| Implement Date | 2020-01-30 |
Price
$ 41
Subtotal
$ 41
Tax
$ 0.00
Order Total (incl. tax)
$ 41