PDF

T/EES 004-2023 Active

T/EES 004-2023 Design specifications for waste heat recovery and heat supply system of coal-fired power plant based on supercharger

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2023-09-21

Abstract

Scope: This document specifies the basic requirements, main equipment selection, and design requirements for the waste steam heat recovery and heating system of steam turbine units in thermal power plants based on reheating steam engines; Main technical content: This document is applicable to the design and engineering acceptance of the waste steam heat recovery and heating system of steam turbine units in thermal power plants based on reheating steam engines.

General Product Information

Document Type Group standards
Standard Status Active
Standard Code T/EES 004-2023
CCS Energy, nuclear technology
ICS Integrated Energy and Heat Transfer Engineering
Implement Date 2023-09-21
Price $ 20.00
Subtotal $ 20.00
Tax $ 0.00
Order Total (incl. tax) $ 20.00

Log In

Contact Us