PDF

GB/T 24184-2009

GB/T 24184-2009 High calcium hot melt slag after desulphurization for sintering flux

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2009-06-25

Abstract

This standard specifies the technical requirements, test methods, inspection rules, transportation, storage, and quality certificates for high-calcium desulfurization slag used as sintering flux (hereinafter referred to as high-calcium desulfurization slag). This standard applies to high-calcium desulfurization slag produced by the desulfurization process of molten iron in a furnace using calcium-based desulfurization agents.

General Product Information

Document Type National standards
Standard Status Replaced
Standard Code GB/T 24184-2009
CCS Other steel products
ICS Other steel products
Implement Date 2010-04-01
Price $ 24.00
Subtotal $ 24.00
Tax $ 0.00
Order Total (incl. tax) $ 24.00

Log In

Contact Us