PDF

T/CABEE 010-2021 Active

T/CABEE 010-2021 Regional Energy System Evaluation Standard

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2021-09-07

Abstract

Main technical content: This standard is applicable to the separate evaluation and overall evaluation of the four stages of regional energy system project planning, feasibility study, design, and operation. Based on the analysis and summary of the existing regional energy system project planning, feasibility study reports, design drawings, and actual operation situations, the standard proposes evaluation methods and indicators for planning, feasibility study, design, and operation. It plays a guiding role in the planning, feasibility study, design, and operation of regional energy systems.

General Product Information

Document Type Group standards
Standard Status Active
Standard Code T/CABEE 010-2021
CCS \nIntegrated energy and nuclear technology
ICS Integrated Energy and Heat Transfer Engineering
Implement Date 2021-11-01
Price $ 20.00
Subtotal $ 20.00
Tax $ 0.00
Order Total (incl. tax) $ 20.00

Log In

Contact Us