PDF

T/CTESGS 03-2022 Active

T/CTESGS 03-2022 Preparation guidelines for special design reports on measures to mitigate the impact of construction projects on flood control within the scope of the rivers and lakes in the Yangtze River Basin and areas to the west of the Lancang River (including the Lancang River itself) management area

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2022-12-07

Abstract

Main technical content: To strengthen the management of construction projects within the scope of river and lake management, and standardize the preparation of special design reports on remedial measures for flood control impacts of construction projects, this standard is formulated in accordance with relevant laws and regulations and provisions, combined with the characteristics of rivers and lakes in the Yangtze River Basin and the area west of Lancang River (including Lancang River), and the actual situation of construction project management

General Product Information

Document Type Group standards
Standard Status Active
Standard Code T/CTESGS 03-2022
ICS Hydraulic structures
Implement Date 2023-01-01
Price $ 20.00
Subtotal $ 20.00
Tax $ 0.00
Order Total (incl. tax) $ 20.00

Log In

Contact Us