PDF

DB32/T 3723-2020 Active

DB32/T 3723-2020 Code for project engineering estimates in well-facilitated farmland construction

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2020-01-06

Abstract

This standard specifies the general principles of the preliminary budget for high-standard farmland construction projects, the method of preparing the preliminary budget, the composition of the preliminary budget documents, the division of project costs, the preparation of the preliminary budget, the editing and review procedures of the preliminary budget documents, and quality control.
This standard is applicable to the preparation of preliminary budgets for high-standard farmland construction projects.

General Product Information

Document Type Jiangsu ProvinceLocal standards
Standard Status Active
Standard Code DB32/T 3723-2020
CCS \nSoil and water and soil conservation
ICS Integrated agriculture and forestry
Implement Date 2020-01-30
Price $ 60
Subtotal $ 60
Tax $ 0.00
Order Total (incl. tax) $ 60

Log In

Contact Us