PDF
DB32/T 3723-2020 Active
DB32/T 3723-2020 Code for project engineering estimates in well-facilitated farmland construction
Abstract
This standard specifies the general principles of the preliminary budget for high-standard farmland construction projects, the method of preparing the preliminary budget, the composition of the preliminary budget documents, the division of project costs, the preparation of the preliminary budget, the editing and review procedures of the preliminary budget documents, and quality control.
This standard is applicable to the preparation of preliminary budgets for high-standard farmland construction projects.
General Product Information
| Document Type | Jiangsu ProvinceLocal standards |
|---|---|
| Standard Status | Active |
| Standard Code | DB32/T 3723-2020 |
| CCS | \nSoil and water and soil conservation |
| ICS | Integrated agriculture and forestry |
| Implement Date | 2020-01-30 |
Price
$ 60
Subtotal
$ 60
Tax
$ 0.00
Order Total (incl. tax)
$ 60