PDF

T/CSPSTC 81-2021 Active

T/CSPSTC 81-2021 Technical code of practice for ecological restoration of slope in open pit mine

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2021-12-16

Abstract

This document establishes the main process types, construction methods, technical requirements, monitoring of construction and post-completion effects, maintenance management, green construction, quality inspection, and project acceptance in the ecological restoration of open-pit mine slopes, including technical preparation, plant selection and configuration, slope safety management, slope vegetation reconstruction, and ecological restoration.
This document is applicable to the ecological restoration of open-pit mine slopes.
This document is not applicable to radioactive mines.

General Product Information

Document Type Group standards
Standard Status Active
Standard Code T/CSPSTC 81-2021
CCS Technical management
ICS Integrated Environment and Environmental Protection
Implement Date 2021-12-31
Price $ 36.00
Subtotal $ 36.00
Tax $ 0.00
Order Total (incl. tax) $ 36.00

Log In

Contact Us