PDF

T/ZJSHIP 005-2024 Active

T/ZJSHIP 005-2024 VOCs gas collection and management technical specifications for ship repair process

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2024-08-23

Abstract

Main technical content: This document specifies the general requirements for VOCs gas collection and treatment during ship repair painting processes, the main process equipment, components and raw materials, process design, on-site construction operations, inspection and process control, project acceptance, operation, maintenance, and labor safety and occupational health. This document is applicable to the VOCs collection and treatment involved in the painting process of ship hulls, cargo holds, hatch covers, and sealed compartments during ship repair. The VOCs collection and treatment involved in ship construction and open-air field painting operations can be implemented with reference to this document.

General Product Information

Document Type Group standards
Standard Status Active
Standard Code T/ZJSHIP 005-2024
ICS General standards for shipbuilding and marine structures
Implement Date 2024-09-01
Price $ 20.00
Subtotal $ 20.00
Tax $ 0.00
Order Total (incl. tax) $ 20.00

Log In

Contact Us