PDF

T/CAPEC 33-2023 Active

T/CAPEC 33-2023 Electric power industry, grinding machine manufacturing supervision and technical requirements

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2023-08-01

Abstract

Scope: This document specifies the technical requirements for the supervision of the manufacture of low-speed coal mills (ball mills), medium-speed coal mills, and high-speed coal mills (fan mills) in thermal power plants. This document is applicable to the supervision of the manufacture of coal mill equipment in thermal power plants. The supervision of the manufacture of coal mill equipment in other industries can be implemented with reference to this document. Main technical content: (1) The scope of the technical requirements for the supervision of the manufacture of coal mills is clarified, which is applicable to power station coal mill equipment. Other industries can implement it with reference. (2) The basic requirements for equipment supervision services are explained. (3) The supervision process related to manufacturing quality is clarified, with emphasis on key points. Appendix "A" provides the control points and supervision methods for the manufacture of coal mills, including: Table "A.1" for the control points and supervision methods for the manufacture of low-speed coal mills (ball mills). Table "A.2" for the control points and supervision methods for the manufacture of medium-speed coal mills. Table "A.3" for the control points and supervision methods for the manufacture of high-speed coal mills (fan mills).

General Product Information

Document Type Group standards
Standard Status Active
Standard Code T/CAPEC 33-2023
ICS Other services
Implement Date 2023-11-01
Price $ 20.00
Subtotal $ 20.00
Tax $ 0.00
Order Total (incl. tax) $ 20.00

Log In

Contact Us