PDF
NB/T 35072-2015 Active
NB/T 35072-2015 NB/T 35072-2015 Water and Power Engineering Special Investment in Soil and Water Conservation Details
Abstract
This set of rules applies to the preparation of special investment for water and soil conservation in the feasibility study phase of hydropower projects. The preparation of the estimate for special investment for water and soil conservation in the pre-feasibility study phase can be appropriately simplified on the basis of this set of rules, according to the depth of design in the pre-feasibility study phase.
General Product Information
| Document Type | Industry standards-Energy |
|---|---|
| Standard Status | Active |
| Standard Code | NB/T 35072-2015 |
| CCS | Hydropower projects |
| ICS | Hydraulic engineering |
| Implement Date | 2016-03-01 |
Price
$ 20.00
Subtotal
$ 20.00
Tax
$ 0.00
Order Total (incl. tax)
$ 20.00