T/ZS 0655-2024 Active Group standards

T/ZS 0655-2024 Road construction project emergency risk assessment guide for production safety accidents

T/ZS 0655-2024 Road construction project emergency risk assessment guide for production safety accidents

Publish Date: 2024-10-15 Implement Date: 2024-10-15 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/ZS 0655-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Road and waterway transportation
ICS Name: Road transport
Publish Date: 2024-10-15
Implement Date: 2024-10-15

Scope

Main technical content: Preface 1 Scope 2 Normative reference documents 3 Terms and definitions 4 Workflow 5 Preparation phase 5.1 Establish an assessment team 5.2 Hold a deployment meeting 5.3 Develop a work plan 5.4 Disclose the assessment technology 6 Assessment phase 6.1 Division of assessment units 6.2 Identify safety risks 6.3 Investigate the current status of risk control 6.4 Assess risk levels 6.5 Statistical analysis of safety risks 7 Summary phase 7.1 Prepare an assessment report 7.2 Establish an information archive 7.3 Determine the type of emergency response plan Appendix A (Informative) Types of risk accidents Appendix B (Informative) List of typical risk events in highway engineering construction projects Appendix C (Normative) List of major risks in traffic and transportation highway construction safety Appendix D (Informative) Reference materials for the risk assessment process Appendix E (Informative) Risk acceptance criteria

Development Information

Related Standards

Contact Us