T/CAGHP 058-2019 Ground settlement prevention and control construction specifications (trial)
T/CAGHP 058-2019 Ground settlement prevention and control construction specifications (trial)
Basic Information
Scope
Main technical content: This specification stipulates the technical requirements, procedures, and inspection and acceptance requirements for the construction of ground settlement monitoring facilities such as bedrock markers, stratified markers, groundwater monitoring wells, pore water pressure monitoring holes, leveling points, satellite positioning system monitoring points, and SAR angle reflectors, as well as the construction of ground settlement prevention and control facilities (projects) such as groundwater recharge wells, grouting, and preloading. This specification applies to the construction, quality inspection, and project acceptance of the monitoring facilities and prevention and control facilities (projects) specified in ground settlement prevention and control projects.