T/EPIAJL 9-2023 Active Group standards

T/EPIAJL 9-2023 Guidelines for the Commissioning and Acceptance of Remote Power Energy Terminals in Power Generation Plants Connected to the Jilin Power Grid

T/EPIAJL 9-2023

Publish Date: 2023-05-01 Implement Date: 2023-05-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/EPIAJL 9-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Terminology (principles and coordination and cooperation)
Publish Date: 2023-05-01
Implement Date: 2023-05-01

Scope

Main technical content: This document specifies the terms and definitions, management responsibilities, main technical indicators, installation and commissioning requirements, grid connection acceptance, operation and maintenance, and inspection and evaluation for the installation and commissioning of remote power energy terminals in grid-connected power plants and substations of Jilin Power Grid Company Limited. This document is applicable to the installation and commissioning of remote power energy terminals in grid-connected power plants and substations within the dispatching jurisdiction of the Power Dispatching and Control Center of State Grid Jilin Electric Power Company Limited (hereinafter referred to as the Power Dispatching and Control Center) at voltages of 66 kV and above, including new construction and renovation (expansion) projects, as well as the acceptance of remote power energy terminals in existing grid-connected power plants and substations. Other voltage-level grid-connected power plants and substations may refer to this document for implementation.

Development Information

Related Standards

Contact Us