T/ZS 0295-2022 The specifications for the filling construction and quality acceptance of open-air abandoned mine pits
T/ZS 0295-2022 The specifications for the filling construction and quality acceptance of open-air abandoned mine pits
Basic Information
Scope
Scope: This document specifies the basic requirements, preliminary preparations, measurement, backfilling construction, and construction acceptance for the backfilling of open-pit mines. This document is applicable to the backfilling of open-pit mines and quality inspection and acceptance in the restoration and management of abandoned mines. For projects involving highways, urban roads, water conservancy projects, and industrial and civil construction projects in the restoration and management of abandoned mines, relevant national standards shall be followed. Main technical contents: Foreword 1 Scope 2 Normative referenced documents 3 Terms and definitions 4 Basic requirements 5 Preliminary preparations 5.1 Construction preparations 5.2 Site and material inspection 6 Measurement 7 Backfilling construction 7.1 General requirements 7.2 Foundation pit backfilling 7.3 Crack filling 7.4 Slope protection 7.5 Construction drainage and water discharge 8 Construction acceptance 8.1 Acceptance process 8.2 Inspection standards 9 Safe construction and environmental protection 9.1 General requirements 9.2 Safe construction 9.3 Environmental protection 9.4 Biological protection 9.5 Cultural relic protection