T/JSEE 001-2024 Active Group standards

T/JSEE 001-2024 Wind power plant neutral compensation configuration technology guidelines for COSCO Offshore Wind Farm

T/JSEE 001-2024 Wind power plant neutral compensation configuration technology guidelines for COSCO Offshore Wind Farm

Publish Date: 2024-01-20 Implement Date: 2024-02-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/JSEE 001-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Wind power generation systems and other energy sources
Publish Date: 2024-01-20
Implement Date: 2024-02-01

Scope

Main technical content: This document specifies the general requirements for reactive power compensation configuration of Zhongyuanhai Wind Farm connected to the high-voltage AC power grid, the technical requirements for reactive power compensation equipment, the configuration requirements for high-voltage parallel reactors, the configuration requirements for dynamic reactive power compensation equipment, and the configuration requirements for low-voltage parallel reactors. This document is applicable to the reactive power compensation configuration of Zhongyuanhai Wind Farm that is transmitted through a 220kV AC submarine cable and has a single submarine cable length of less than 120km. Offshore wind farms transmitted through submarine cables of other voltage levels can refer to and implement this document accordingly.

Development Information

Related Standards

Contact Us