T/CEC 5046-2021 Active Group standards

T/CEC 5046-2021 Pre-feasibility study report preparation guidelines for a pumped hydro storage power station

T/CEC 5046-2021 Pre-feasibility study report preparation guidelines for a pumped hydro storage power station

Publish Date: 2021-06-29 Implement Date: 2021-10-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CEC 5046-2021
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Hydraulic engineering
Publish Date: 2021-06-29
Implement Date: 2021-10-01

Scope

Main technical content: 1.0.1 In order to standardize the preparation of pre-feasibility study reports for pumped storage power stations, clarify the content and depth of the reports, and ensure that they are technically advanced and economically reasonable, these guidelines are hereby formulated. 1.0.2 These guidelines are applicable to the preparation of pre-feasibility study reports for new, reconstructed, and expanded pumped storage power station projects. 1.0.3 The preparation of pre-feasibility study reports for pumped storage power station projects should be carried out on the basis of the selection and planning of pumped storage power stations in the region.

Development Information

Related Standards

Contact Us