NB/T 20425-2017 Active Industry standards-Energy

NB/T 20425-2017 The development method for safety evaluation of probability of flooding inside a nuclear power plant

NB/T 20425-2017 The development method for safety evaluation of probability of flooding inside a nuclear power plant

Publish Date: 2017-02-10 Implement Date: 2017-07-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 30
Download

Basic Information

Standard Code: NB/T 20425-2017
Standard Type: Industry standards
Standard Status: Active
is_force_gb: no
CCS Name: \nNuclear island of a nuclear power plant
ICS Name: Nuclear power stations, safety
Publish Date: 2017-02-10
Implement Date: 2017-07-01
Pages: 26 pages

Scope

This standard specifies the development method for the Level 1 Probabilistic Safety Assessment (PSA) of flooding inside nuclear power plants, and provides the analysis process and key points of the Level 1 PSA of flooding inside nuclear power plants. This standard is applicable to the Level 1 PSA of flooding inside pressurized water reactor nuclear power plants during power operation conditions. After considering the characteristics of the shutdown condition and making appropriate adjustments, it is also applicable to the Level 1 PSA of flooding inside nuclear power plants during the shutdown condition. Nuclear power plants of other reactor types may refer to and implement it accordingly.

Development Information

Pages: 26 pages

Related Standards

Contact Us