T/CERS 0096-2025 Active Group standards

T/CERS 0096-2025 Technical requirements for Power Grid Edge Smart Device Operating System

T/CERS 0096-2025 Technical requirements for Power Grid Edge Smart Device Operating System

Publish Date: 2025-08-27 Implement Date: 2025-08-27 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CERS 0096-2025
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: The integrated transmission and distribution network
Publish Date: 2025-08-27
Implement Date: 2025-08-27

Scope

This document specifies the reference architecture, general technical requirements, edge computing framework technical requirements, security technical requirements, stability and reliability technical requirements, and open-source technical requirements for intelligent terminal operating systems on the edge side of the power grid. This document is applicable to intelligent terminal operating systems in core business scenarios on the edge side of the power grid, such as power grid production control (e.g., distribution automation DA, feeder automation FA, and relay protection information management), operation monitoring (e.g., substation status monitoring and line online monitoring), electricity consumption information collection, distributed energy monitoring, and source-grid-load-storage coordinated control.

Development Information

Related Standards

Contact Us