T/CRS C1101-2022 Urban rail transit electrification construction and quality acceptance standards
T/CRS C1101-2022 Urban rail transit electrification construction and quality acceptance standards
Basic Information
Scope
Scope: Urban rail electrification project construction; Main technical content: 1. General provisions specify the purpose of the standard, its scope of application, quality requirements, and the basic principles for implementing this standard. 2. Basic provisions clarify the general requirements for urban rail electrification projects, the division of project quality acceptance units, project quality acceptance, project quality acceptance procedures, and the basic requirements for organization. 3. Construction preparation clarifies the preparatory work that should be done before construction. It stipulates the requirements for preparing construction plans, reviewing design documents, conducting preliminary surveys, holding drawing reviews and design briefings, providing technical briefings on construction, allocating construction resources, and preparing materials and equipment. 4. General requirements for substation construction are specified, clarifying the acceptance standards and regulations for equipment and materials entering the site. Clear requirements are set for the construction standards and acceptance conditions of each sub-project, and advanced phase-identical power supply devices are introduced, with clear installation and acceptance standards specified. 5. General requirements for overhead contact line construction are specified, clarifying the acceptance standards and regulations for equipment and materials entering the site. The overhead contact line is divided into flexible and rigid sections for flexible and rigid contact lines, and clear requirements are set for the construction standards and acceptance conditions of each sub-project. 6. General requirements for power engineering construction are specified, clarifying the acceptance standards and regulations for equipment and materials entering the site. Clear requirements are set for the construction standards and acceptance conditions of each sub-project. 7. General requirements for telemetry s