T/SHJX 004-2020 Active Group standards

T/SHJX 004-2020 Shanghai Metro Tunnel and Underground Engineering Quality Acceptance Standards (Trial Version)

T/SHJX 004-2020 Shanghai Metro Tunnel and Underground Engineering Quality Acceptance Standards (Trial Version)

Publish Date: 2020-09-22 Implement Date: 2021-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/SHJX 004-2020
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: \nTransportation Engineering
ICS Name: Integrated Railway Engineering
Publish Date: 2020-09-22
Implement Date: 2021-01-01

Scope

Main Technical Content: 1 General Provisions 2 Terminology 3 Basic Regulations 3.1 General Provisions 3.2 Division of Engineering Quality Acceptance Units 3.3 Engineering Quality Acceptance 3.4 Engineering Quality Acceptance Procedures and Organization 4 Drainage and Water Reduction 4.1 General Provisions 4.2 Open Drainage in Foundation Pits 4.3 Light Well Points 4.4 Jet Well Points 4.5 Drainage and Water Reduction Pipe Wells 4.6 Pressure Reduction Drainage Pipe Wells 4.7 Water Level Observation Wells 4.8 Risk Control of Pressure Reduction Drainage Operation 4.9 Re-injection Pipe Wells 4.10 Pipe Well Sealing 4.11 Deep Well Point Drainage 5 Foundation and Foundation Pits 5.1 General Provisions 5.2 Diaphragm Walls 5.3 Cement-Soil Gravity Walls 5.4 Steel-Concrete Mixing Walls 5.5 Channel-Type Cutting Cement-Soil Continuous Walls (TRD) 5.6 Bored Piles for Pile-Wall Support 5.7 Precast Reinforced Concrete Sheet Piles 5.8 Steel Sheet Piles 5.9 Interlocking Piles 5.10 Replacement Method 5.11 Preloading Method 5.12 Dynamic Compaction Method 5.13 Cement-Soil Mixing Piles 5.14 Grouting Method 5.15 High-Pressure Jet Grouting 5.16 Omnidirectional High-Pressure Jet Grouting (MJS) 5.17 Ultra-High-Pressure Composite Jet Grouting (RJP) 5.18 Freezing Method 5.19 Root Piles 5.20 Bored Piles 5.21 PHC Pipe Piles 6 Open-Cut Structures 6.1 General Provisions 6.2 Pile Foundation Works 6.3 Foundation Pit Excavation 6.4 Support Systems 6.5 Formwork and Scaffolding 6.6 Reinforcing Steel Works 6.7 Concrete Works 6.8 Back-Filtration Layers 6.9 Soil Backfilling 7 Pipe-Jacking Method 7.1 General Provisions 7.2 Work Pits (Holes) 7.3 Start and Reception Shaft Construction and Protection 7.4 Pipe Section Fabrication 7.5 Pipe Section Jacking 7.6 Post-Jacking Grouting 8 Shield Tunneling 8.1 General Provisions 8.2 Segment Fabrication 8.3 Shield Start and Reception 8.4 Shield Tu

Development Information

Related Standards

Contact Us