T/JSAS 070-2024 Active Group standards

T/JSAS 070-2024 Operating Procedures for Filling Methanol Fuel into Ships by Tank Trucks

T/JSAS 070-2024 The operating procedures for filling methanol fuel into a tanker truck for ships

Publish Date: 2024-12-23 Implement Date: 2025-01-02 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/JSAS 070-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Other equipment used in shipbuilding
ICS Name: General standards for shipbuilding and marine structures
Publish Date: 2024-12-23
Implement Date: 2025-01-02

Scope

Scope: This document specifies the operating procedures for bunkering methanol fuel into ships by tank trucks. This document applies to the bunkering of methanol fuel into methanol-powered ships by tank trucks. Main technical content: 3.1 Terms and definitions The following terms and definitions apply to this document. 3.1 Bunkering The process of transferring methanol fuel from tank trucks to methanol-powered ships. 3.2 Receiving ship A ship powered by methanol fuel. 3.3 Fuel tank A tank on the receiving ship used to store methanol fuel. 3.4 Insulation flange A flange on the bunkering station of the receiving ship used to connect the bunkering hose. 3.5 Dry joint A joint installed on the bunkering pipe of the receiving ship, used to connect the bunkering hose and prevent fuel leakage when dismantled. 3.6 Breakaway coupling A coupling installed on the bunkering pipe to prevent excessive pulling forces from damaging the receiving ship's bunkering station facilities when the receiving ship drifts away from the bunkering position due to water currents or other factors. 4. General requirements 4.1 Before bunkering, the operator shall report to the relevant departments of the local competent authorities and obtain written approval before proceeding. 4.2 During the bunkering process, approval procedures must be followed in accordance with company regulations, and no unauthorized actions are allowed. 4.3 During the bunkering process, strict adherence to safety management regulations and no unauthorized operations are allowed. 4.4 During the bunkering process, any random discharge of methanol fuel or steam is prohibited to prevent environmental pollution. 4.5 Documentation records must be maintained during the bunkering process. 4.6 Prior to bunkering, operational and emergency response drills must be conducted to ensure that operators are familiar with their duties and responsibilities. 5. Environmental conditions 5.1 Cl

Development Information

Related Standards

Contact Us