GB/T 14627-1993
Replaced
DL/T 2593-2023
Active
Industry standards-Electricity
DL/T 2593-2023 Reversible Pumping Hybrid Energy Storage Unit Startup Debugging Guidelines
DL/T 2593-2023 Reversible Pumping Hybrid Energy Storage Unit Startup Debugging Guidelines
Price:
$ 30
Basic Information
Standard Code:
DL/T 2593-2023
Standard Type:
Industry standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
\nHydraulic turbines and their auxiliary equipment
ICS Name:
Hydraulic engineering
Publish Date:
2023-02-06
Implement Date:
2023-08-06
Scope
This document specifies the conditions, test items, and specific requirements for the startup and commissioning of reversible pumped storage units. This document is applicable to newly built pumped storage units, and units after major overhauls can refer to it for use. This document is not applicable to variable-speed pumped storage units.
Development Information
Related Standards
GB/T 15468-1995
Replaced
GB/T 15468-1995 Fundamental technical requirements for hydraulic turbines
GB/T 15469-1995
Replaced
GB/T 15469-1995 Cavitation pitting evaluation in reaction hydraulic turbines
GB/T 15613-1995
Replaced
GB/T 15613-1995 Code for model acceptance tests of hydraulic turbines
GB/T 16166-1996
Replaced
GB/T 16166-1996 Sacrificial anode cathodic protection for seawater cooling system in coastal power station
GB/T 10969-1996
Replaced