T/GDSES 22-2025 "Exhaust duct evaporation system debugging guidelines for zero discharge of coal-fired power plant wastewater bypass"
T/GDSES 22-2025 "Exhaust duct evaporation system debugging guidelines for zero discharge of coal-fired power plant wastewater bypass"
Basic Information
Scope
Main technical content: Preface Scope Normative references Terms and definitions General requirements Debugging work procedures Divisional trial run of the system Full-scale start-up and trial run of the system Shutdown of the system Abnormal situation handling Technical file management Appendix A (Information) Outline for the debugging of the wastewater zero discharge bypass flue evaporation system Preparation content and editing and review procedures Appendix B (Information) Preparation content and editing and review procedures for the debugging plan of the wastewater zero discharge bypass flue evaporation system Appendix C (Information) Disclosure record form for the debugging plan of the wastewater zero discharge bypass flue evaporation system Appendix D (Information) Condition check confirmation form Appendix E (Information) On-site debugging record form Appendix F (Information) Logic interlocking protection confirmation form Appendix G (Information) Full-scale load debugging quality inspection and evaluation form