T/HNTS 0006-2021 Iron pipe intermodal transportation loading and unloading operation information exchange protocol
T/HNTS 0006-2021 Iron pipe intermodal transportation loading and unloading operation information exchange protocol
Basic Information
Scope
Main Technical Content: Information Exchange Procedures for Loading and Unloading Operations in Iron Pipe Combined Transport 1 Scope This standard specifies the information exchange procedures and definitions for loading and unloading operations in iron pipe combined transport. It applies to the organization and implementation of unloading trains and transferring containers to belt conveyors using the iron pipe combined transport information exchange platform as the carrier. 2 Normative Reference Documents The content of the following documents is incorporated into this document as essential provisions through normative reference. Among them, the dated reference documents apply only to the version specified on the date. The undated reference documents apply to the latest version (including all amendment lists). - TB 10081: Design Specifications for Railway Transport Management Information Systems (Trial) - Q/CR 775: Technical Specifications for Information Sharing and Exchange in Railway Information Systems - DB21/T 2701.1: Information Exchange Procedures for Loading and Unloading Operations in Container Sea-rail Combined Transport 3 Terms and Definitions The following terms and definitions apply to this document. 3.1 Iron Pipe Combined Transport A multimodal transport method that combines rail and tubular belt conveyors. 3.2 Railway Transport Plan A comprehensive arrangement for production and management activities based on railway transport tasks and a balanced consideration of various factors. 3.3 Receiving Railway Transport Plan A basic data for loading operations at the departure station, provided by the railway carrier to the departure station before loading the goods. 3.4 Loading List A list generated by the departure station after matching trains with containers and completing loading operations based on the railway transport plan. 3.5 Unloading Plan A basic data for unloading operations at the transfer station, provided