T/ZNL 004-2023 Active Group standards

T/ZNL 004-2023 Distributed Lithium-Ion Energy Storage Device Installation and Operation Specification

T/ZNL 004-2023 Distributed Lithium-Ion Energy Storage Device Installation and Operation Specification

Publish Date: 2023-11-30 Implement Date: 2023-12-29 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Download

Basic Information

Standard Code: T/ZNL 004-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Comprehensive Electrical Engineering
Publish Date: 2023-11-30
Implement Date: 2023-12-29
Pages: 12 pages

Scope

Scope: This standard specifies the basic requirements, design, construction, acceptance, operation, and emergency response for distributed lithium-ion energy storage devices. This standard applies to distributed lithium-ion battery energy storage devices with a rated power of 100kW to 500kW and a rated energy of 100kWh to 500kWh. This standard does not apply to mobile energy storage systems. Main technical content: This document specifies the basic requirements, design, construction, acceptance, operation, and emergency response functions and performance of small-scale distributed lithium-ion energy storage devices (hereinafter referred to as "distributed energy storage devices"). This document applies to the installation and operation of lithium-ion battery distributed energy storage devices with a rated power of 100kW to 500kW or a rated energy of 100kWh to 500kWh.

Development Information

Pages: 12 pages

Related Standards

Contact Us