T/CAPEC 1-2018 Active Group standards

T/CAPEC 1-2018 Technical requirements of manufacturing consulting service for power plant boiler

T/CAPEC 1-2018 Technical requirements of manufacturing consulting service for power plant boiler

Publish Date: 2018-12-28 Implement Date: 2019-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 36.00
Out of stock

Basic Information

Standard Code: T/CAPEC 1-2018
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: \nBasic standards
ICS Name: Other services
Publish Date: 2018-12-28
Implement Date: 2019-01-01
Pages: 28 pages

Scope

This standard specifies the basic technical requirements for equipment supervision services related to the manufacturing quality of power station boiler equipment. This standard applies to the main components of coal-fired power station boilers (including circulating fluidized bed boilers) and power generation waste heat boilers with a rated steam pressure of 3.8 MPa or more. The manufacturing supervision of oil-fired, gas-fired, and ship boilers can refer to this standard.

Development Information

Word Count: 42 Thousand words Pages: 28 pages

Referenced Standards

Related Standards

Contact Us