DB51/T 3231-2024 Active Sichuan ProvinceLocal standards

DB51/T 3231-2024 Road tunnel rock burst prevention and control technical specification

DB51/T 3231-2024 Road tunnel rock burst prevention and control technical specification

Publish Date: 2024-12-18 Implement Date: 2025-01-18 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: DB51/T 3231-2024
Standard Type: Local standards
Standard Status: Active
is_force_gb: no
CCS Name: Earth and stone work, tunnel engineering
ICS Name: \nTunnel construction
Publish Date: 2024-12-18
Implement Date: 2025-01-18

Scope

This document establishes the procedures for the prevention and control of rock bursts in highway tunnels, and provides guidelines for the steps of surveying and predicting rock burst sections, designing rock burst tunnels, constructing rock burst sections, and monitoring and warning of rock burst sections. This document is applicable to the prevention and control of rock bursts in mountainous highway tunnels constructed by drilling and blasting methods and TBM methods in Sichuan Province. Other types of tunnels can refer to and implement it for reference.

Development Information

Related Standards

Contact Us