T/CAPEC 37-2024 Active Group standards

T/CAPEC 37-2024 Urban rail transit engineering integrated monitoring system supervision technical requirements

T/CAPEC 37-2024 Urban rail transit engineering integrated monitoring system supervision technical requirements

Publish Date: 2024-04-26 Implement Date: 2024-08-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CAPEC 37-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Other services
Publish Date: 2024-04-26
Implement Date: 2024-08-01

Scope

Scope: This document specifies the technical requirements for supervision of all processes during the design, manufacture, storage and transportation, installation, commissioning, acceptance, and quality assurance period of urban rail transit engineering integrated monitoring systems. This document is applicable to supervision services for urban rail transit engineering integrated monitoring systems. Main technical content: (1) Clarifies the scope of application of the standard, which applies to supervision activities during the design, manufacture, storage and transportation, installation, commissioning, and acceptance of urban rail transit engineering integrated monitoring systems. (2) Provides a statistical summary of relevant standard documents referenced in the preparation of the "Supervision Technical Requirements for Urban Rail Transit Engineering Integrated Monitoring Systems". (3) Proposes important terms and definitions related to the supervision of urban rail transit engineering integrated monitoring systems to standardize and unify terminology. (4) Elaborates on the general requirements for supervision processes related to quality. (5) Specifies the specific requirements for supervision processes related to design quality. (6) Specifies the specific requirements for supervision processes related to manufacturing quality. (7) Specifies the specific requirements for supervision processes related to storage and transportation quality. (8) Specifies the specific requirements for supervision processes related to installation quality. (9) Specifies the specific requirements for supervision processes related to commissioning quality. (10) Specifies the specific requirements for supervision processes related to acceptance quality. Appendix A: Main witnessing points and witnessing methods for the supervision process of urban rail transit engineering integrated monitoring systems

Development Information

Related Standards

Contact Us