T/CNS 60-2022 Active Group standards

T/CNS 60-2022 High-temperature gas-cooled reactor nuclear power plant first loading and initial criticality test

T/CNS 60-2022 High-temperature gas-cooled reactor nuclear power plant first loading and initial criticality test

Publish Date: 2022-12-16 Implement Date: 2023-04-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Download

Basic Information

Standard Code: T/CNS 60-2022
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Energy, nuclear technology
ICS Name: Nuclear power stations, safety
Publish Date: 2022-12-16
Implement Date: 2023-04-01
Pages: 7 pages

Scope

Scope: This document is applicable to the first loading and initial criticality test of the reactor in a spherical bed high-temperature gas-cooled reactor nuclear power plant; Main technical content: This document describes the special preventive measures, prerequisites, initial conditions, test steps, and acceptance criteria for the first loading and initial criticality test of the reactor in a high-temperature gas-cooled reactor nuclear power plant during the commissioning test phase.

Development Information

Pages: 7 pages

Related Standards

Contact Us