GB/T 14541-1993
Replaced
T/CEC 650-2022
Active
Group standards
T/CEC 650-2022 Guidelines for Operation and Maintenance of Steam-powered Blower in Coal-fired Power Plant
T/CEC 650-2022 Guidelines for Operation and Maintenance of Steam-powered Blower in Coal-fired Power Plant
Price:
$ 20.00
Basic Information
Standard Code:
T/CEC 650-2022
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
-
ICS Name:
Integrated power station
Publish Date:
2022-06-23
Implement Date:
2022-10-01
Scope
Main technical content: This document specifies the principle technical requirements and operating methods for the start-up, operation and maintenance, shutdown, testing, auxiliary system operation and maintenance, and fault and accident prevention and handling of steam-driven induced draft fans in thermal power plants. This document is applicable to steam-driven induced draft fans of units with a capacity of 300 MW to 1000 MW. Steam-driven induced draft fans of other capacity units can be implemented with reference to this document.
Development Information
Related Standards
GB/T 14542-1993
Replaced
GB/T 14542-1993 Guide for maintenance and supervision of transformer oil in service
GB/T 2819-1995
Active
GB/T 2819-1995 Mobile electric power plant, general specification for
GB/T 15149.2-1998
Abolished
GB/T 15149.2-1998 Performance and testing of teleprotection eguipment of power systems Part 2:Analogue comparison systems
GB/T 15153.1-1998
Replaced
GB/T 15153.1-1998 Telecontrol equipment and systems Part 2:Operating conditions Section 1:Power supply and electromagnetic compatibility
GB/T 17463-1998
Active